TIMELINE
1999
CONSTRUCTION
front yard
entrance
city problems
hull outside
hull inside
cleaning
engine
boiler
cementing
progress
roof
front
back
rails
paddlewheels
2000
THE MOVE
2001
IMPROVEMENT
2002
ARTISTS
POEMS
STORIES
ARTICLES
WHAT'S NEW
SITE MAP
THE HULL
The hull is divided into 4 bulkhead areas: the ENGINE room; the BOILER area; the front bulkhead was remove or didn't exist [hatchway is drawn as a square]; and the back. The paddlewheels flank the engine room.
NEXT
SS Vallejo
36 Varda Landing Sausalito, CA 94965
info@vallejo.to